Shop Overhead Cranes BreakdownInside

When loads get too big for forklifts and too precise for rough handling, teams turn to overhead cranes. This practical guide takes you behind the scenes of a mega-project crane install. You’ll see rails and runway alignment—all explained in clear, real-world language.

Bridge Crane Basics

An overhead crane rides on parallel runways anchored to a building frame, carrying a trolley-mounted hoist for precise, vertical picks. The result is smooth X-Y-Z motion: and lift via the hoist.

They’re the backbone of heavy shops and assembly lines, from beam handling to turbine assembly.

Why they matter:

Safe handling of very heavy, unwieldy loads.

Less manual handling, fewer delays.

Repeatable, precise positioning that reduces damage.

Support for pipelines, structural steel, and big machinery installs.

What This Install Includes

Runways & rails: continuous beams and rail caps.

End trucks: wheel assemblies that ride the rail.

Bridge girder(s): cambered and pre-wired.

Trolley & hoist: cross-travel carriage with lifting unit.

Electrics & controls: power supply, festoon or conductor bars.

Stops, bumpers & safety: overload protection, e-stops.

Depending on capacity and span, the crane might be a single-girder 10-ton unit or a massive double-girder 100-ton system. The choreography is similar, but the scale, lift plans, and checks grow with the tonnage.

Make-Ready & Surveys

Good installs start on paper. Key steps:

Drawings & submittals: Approve general arrangement (GA), electrical schematics, and loads to the structure.

Permits/JSAs: Job Safety Analysis (JSA) for each lift step.

Runway verification: Check baseplates, grout pads, and anchor torque.

Power readiness: Confirm conductor bars or festoon supports, cable trays, and isolation points.

Staging & laydown: Lay out slings, shackles, spreader bars, and chokers per rigging plan.

People & roles: Appoint a lift director, rigger, signaler, and electrical lead.

Millimeters at the runway become centimeters at full span. Spend time here.

Getting the Path Right

If rails are off, nothing else will run true. Targets and checks:

Straightness & elevation: Laser or total station to set rail height.

Gauge (span) & squareness: Check centerlines at intervals; confirm end squareness and expansion joints.

End stops & buffers: Verify clearances for bumpers at both ends.

Conductor system: Mount conductor bars or festoon track parallel to the rail.

Log final numbers on the ITP sheet. Correct now or pay later in wheel wear and motor overloads.

Girder Erection & End Trucks

Rigging plan: Choose spreader bars to keep slings clear of electricals. Taglines for swing control.

Sequence:

Lift end trucks to runway level and set temporarily on blocks.

For double-girder cranes, lift both girders with a matched raise.

Land the bridge on the end trucks and pin/bolt per GA.

Verify camber and bridge square.

Prior to trolley install, bump-test long-travel motors with temporary power (under permit): ensure the line construction correct rotation and brake release. Lock out after test.

Hoist & Trolley

Trolley installation: Hoist/trolley arrives pre-assembled or as modules.

Hoist reeving: Lubricate wire rope; verify dead-end terminations.

Limits & load devices: Check overload/SLI and emergency stop.

Cross-travel adjustment: Verify end stops and bumpers.

Pendant/remote: Install pendant festoon or pair radio receiver; function-test deadman and two-step speed controls.

A smooth trolley with a quiet hoist is a sign of good alignment. Don’t mask issues with higher VFD ramps.

Drive Tuning & Interlocks

Power supply: Drop leads tagged and strain-relieved.

Drive setup: Program VFDs for soft starts, decel ramps, and brake timing.

Interlocks & safety: E-stops, limit switches, anti-collision (if multiple cranes), horn, beacon.

Cable management: Secure junction boxes; label everything for maintenance.

Future you will too. Photos of terminations help later troubleshooting.

QA/QC & Documentation

Inspection Test Plan (ITP): Third-party witness for critical steps.

Torque logs: Record wrench serials and values.

Level & gauge reports: Note any corrective shims.

Motor rotation & phasing: Confirm brake lift timing.

Functional tests: Anti-collisions and zone interlocks.

A tidy databook speeds client acceptance.

Ready for Work

Static load test: Hold at mid-span and near end stops; monitor deflection and brake performance.

Dynamic load test: Travel long-run, cross-travel, and hoist at rated speed with test load.

Operational checks: Emergency stop shuts down all motions.

Training & handover: Operator basics, daily pre-use checks, rigging do’s & don’ts.

When the logbook is clean, the crane is officially in service.

Everyday Heavy Lifting

Construction & steel erection: handling long members safely.

Oil & gas & power: generator and turbine assembly.

Steel mills & foundries: large part transfer.

Warehousing & logistics: bulk material moves with minimal floor traffic.

Floor stays clear, production keeps flowing, and precision goes up.

Safety & Engineering Considerations

Rigging discipline: dedicated signaler and stop-work authority.

Lockout/Tagout: clear isolation points for electrical work.

Fall protection & edges: approved anchor points, guardrails on platforms, toe boards.

Runway integrity: regular runway inspection plan.

Duty class selection: match crane class to cycles and loads.

Safety isn’t a stage—it's the whole show.

If It Doesn’t Run Smooth

Crab angle/drift: re-check runway gauge and wheel alignment.

Hot gearboxes: misalignment or over-tight brakes.

Rope drum spooling: check fleet angle and sheave alignment.

Pendant lag or dropout: shield noisy VFD cables.

Wheel wear & rail pitting: lubrication and alignment issues.

Little noises are messages—listen early.

Fast Facts

Overhead vs. gantry? Choose per site constraints.

Single vs. double girder? Singles are lighter and cheaper; doubles carry heavier loads and give more hook height.

How long does install take? Scope, bay readiness, and tonnage rule the schedule.

What’s the duty class? FEM/ISO or CMAA classes define cycles and service—don’t guess; size it right.

Why Watch/Read This

Students and pros alike get a front-row seat to precision rigging, structural alignment, and commissioning. You’ll see how small alignment wins become big reliability wins.

Want ready-to-use checklists for runway surveys, torque logs, and load-test plans?

Grab the installer pack and cut hours from setup while boosting safety and QA/QC. Bookmark this guide and share it with your crew.

...